
Wall Street Journal:
A look at the global AI data center buildout, its limits, and ROI concerns; in 2025, US capacity that is built, underway, planned, or stalled has topped 80 GW — Record capital expenditures and data-center planning run up against the ground truths of physical infrastructure

Wall Street Journal:
A look at the global AI data center buildout, its limits, and ROI concerns; in 2025, US capacity that is built, underway, planned, or stalled has topped 80 GW — Record capital expenditures and data-center planning run up against the ground truths of physical infrastructure
Source: TechMeme
Source Link: http://www.techmeme.com/251115/p3#a251115p3